RFI-01What services does CK Civil provide?
Site civil engineering under three pillars: Planning (due diligence, feasibility, conceptual layouts, zoning and entitlement support), Design (site layout, grading, stormwater, erosion control, and permit-ready construction documents), and Consulting (stormwater compliance, permitting strategy, and construction-phase support). Most projects move through more than one pillar — the three are built to connect, not operate as separate menus.
RFI-02What areas does CK Civil serve?
Private developers building in Georgia. Every project gets a jurisdiction-specific read on that site's zoning, permitting, and review process — not a generic standard applied the same way everywhere.
RFI-03When should I bring in a civil engineer — before or after I'm under contract on a property?
As early as possible, ideally before you're locked into a purchase price or closing date. A due diligence and feasibility review during your evaluation period can catch site constraints — topography, drainage, utility availability, zoning fit — that affect what the property can actually support, before those become expensive surprises after closing.
See: Due Diligence & Feasibility →RFI-04What's the difference between due diligence, conceptual site layouts, and full site design?
Due diligence is a fast, focused read on a site's potential and constraints, used to evaluate a property before you're committed. Conceptual site layouts come next — quick, comparative sketches weighing a few development directions against yield, cost, and constraints. Full site design is the detailed technical package built once a direction is chosen, engineered to your jurisdiction's actual submission standards.
See: Site Layout & Development Plans →RFI-05What permits will my project need in Georgia?
It depends on the site and jurisdiction, but most land-disturbing projects need some combination of local zoning or land-disturbance approval, and — for sites disturbing an acre or more — coverage under Georgia's NPDES construction stormwater permit with an erosion, sedimentation, and pollution control plan. Mapping the specific requirements for your project, before you're deep into design, is what a permitting strategy is for.
See: Permitting Strategy & Municipal Coordination →RFI-06How long does permitting and site plan review take?
It varies by jurisdiction, project scope, and how complete the submission is — there's no single statewide timeline, and we won't invent one. What's controllable is avoiding the most common cause of delay: a plan that doesn't match how the specific reviewing jurisdiction actually evaluates submissions. That's the point of mapping a jurisdiction-specific strategy before you submit, not after the first round of review comments.
See: Permitting Strategy & Municipal Coordination →RFI-07Will I work directly with the engineer, or get passed to a project team?
Directly with the engineer on your project, from the first call through final permit — no hand-offs, no rotating account managers. That's a deliberate structure: founder-level attention on every project, not a byproduct of firm size.
See: About CK Civil →RFI-08Does CK Civil handle stormwater compliance during construction, or just the design?
Both. Stormwater management and drainage design happens during Design, but compliance doesn't stop once a permit is issued — stormwater compliance consulting and construction-phase support carry that same jurisdiction-specific approach through inspections and whatever field conditions come up once work starts.
See: Construction-Phase Support →RFI-09Is CK Civil a new firm? What's your experience?
CK Civil is a newer firm, built around direct, senior-level engineering instead of a large account-management structure — when you call, you're talking to the person actually doing the work. That's the trade we're making deliberately: direct access over firm history.
See: About CK Civil →RFI-10How do I get started?
Reach out with a bit about your project — location, scope, and where things currently stand, whether that's raw land, a property under contract, or a project already mid-design. We'll follow up directly to figure out the right starting point.